The proposed site and surroundings
The proposed site lies about 370m north of the centre of Bourne End and 3.2km west of the centre of Hemel Hempstead. It is currently an agricultural field with boundary hedgerows to the north, south and west. A railway line also runs along the southern aspect and, from there, the land slopes up towards the north.
Current use of land: | Agricultural |
Flood zone rating: | Flood zone 1 |
Total site area: | 32 hectares |
Land designation: | Green belt |
Site access: | Good |
Point of connection location: | On-site connection to 33-kV pole on western boundary |